The presumed procedural outline of renewable energy power generation equipment is divided into two phases and 6 steps. Phase one is to apply for and agree on the backup plan. Phase two is applying for equipment registration while the main steps includes setting up the power generation equipments, parallel connection test run, examination of written documents and onsite inspection.