The presumed procedural outline of Solar PV power generation equipment is divided into two phases and 6 steps.
Phase one is to apply for and agree on the backup plan. The main steps include the examination of parallel connection opinions paper, examination of written documents and the signing of the electricity sales contract.
Phase two is applying for equipment registration while the main steps includes setting up the power generation equipments, parallel connection test run, examination of written documents and onsite inspection.