:::

Presumed Procedural Outline of Solar PV Power Generation Equipments

Facebook Line Twitter Plurk
The presumed procedural outline of Solar PV power generation equipment is divided into two phases and 6 steps.
 
Phase one is to apply for and agree on the backup plan. The main steps include the examination of parallel connection opinions paper, examination of written documents and the signing of the electricity sales contract.
 
Phase two is applying for equipment registration while the main steps includes setting up the power generation equipments, parallel connection test run, examination of written documents and onsite inspection.
 
Presumed Procedural Outline of Renewable Energy Power Generation Equipments

Update: 2023-11-27
Go Back. Top
Government Website Open Information Announcement | Privacy Policy | Security Policy
Address : 13F., No.2, Fusing N. Rd., Jhongshan District., Taipei City 104100, Taiwan (R.O.C.) | MAP | Emergency Response Call Center
Phone Number : 886-2-2772-1370
FAX : 886-2-2711-5891 or 886-2-2776-9417
Best browse supported with IE and Firefox with 1024 x 768 resolution
Update: 2024-05-14  Visitor: 5,826,161